Home|Projects|INSTALLATION OF SIX GENMA RTG CRANES AT PHNOM PENH PORT

INSTALLATION OF SIX GENMA RTG CRANES AT PHNOM PENH PORT 1
INSTALLATION OF SIX GENMA RTG CRANES AT PHNOM PENH PORT 2
INSTALLATION OF SIX GENMA RTG CRANES AT PHNOM PENH PORT 3
INSTALLATION OF SIX GENMA RTG CRANES AT PHNOM PENH PORT 4
INSTALLATION OF SIX GENMA RTG CRANES AT PHNOM PENH PORT 5
INSTALLATION OF SIX GENMA RTG CRANES AT PHNOM PENH PORT 6
INSTALLATION OF SIX GENMA RTG CRANES AT PHNOM PENH PORT 7
INSTALLATION OF SIX GENMA RTG CRANES AT PHNOM PENH PORT 8
INSTALLATION OF SIX GENMA RTG CRANES AT PHNOM PENH PORT 9

INSTALLATION OF SIX GENMA RTG CRANES AT PHNOM PENH PORT

RTG Installation

Customer: Phnom Penh Port

Industry: Port

Project location: Campuchia

Project details

Bac Au participated in the installation and commissioning of six GENMA Rubber-Tyred Gantry (RTG) cranes in Cambodia. The scope of work included mechanical erection, electrical system installation and connection, technical inspection, testing, commissioning, and equipment acceptance in accordance with the manufacturer’s standards.

With a team of engineers experienced in port equipment and crane systems, Bac Au worked closely with GENMA to complete the project on schedule while meeting all safety, quality, and operational performance requirements prior to handover to the customer.

Scope of Work

  • Complete erection of six GENMA RTG cranes
  • Installation and connection of electrical and control systems
  • Inspection and alignment of mechanical components and equipment
  • Commissioning and functional testing
  • No-load and load testing
  • Support for final acceptance and operational handover

Project Outcomes

  • Installation completed on schedule
  • Safe, stable, and reliable equipment operation ensured
  • All manufacturer’s technical requirements satisfied
  • Equipment ready for commercial operation
Westwell
Sibre
Prysmian
Nordic Lights
Yaskawa
igus
(+84) 28 -73022888
Leave a Message
Facebook Chat