INSTALLATION OF SIX GENMA RTG CRANES AT PHNOM PENH PORT
RTG InstallationCustomer: Phnom Penh Port
Industry: Port
Project location: Campuchia
Project details
Bac Au participated in the installation and commissioning of six GENMA Rubber-Tyred Gantry (RTG) cranes in Cambodia. The scope of work included mechanical erection, electrical system installation and connection, technical inspection, testing, commissioning, and equipment acceptance in accordance with the manufacturer’s standards.
With a team of engineers experienced in port equipment and crane systems, Bac Au worked closely with GENMA to complete the project on schedule while meeting all safety, quality, and operational performance requirements prior to handover to the customer.
Scope of Work
- Complete erection of six GENMA RTG cranes
- Installation and connection of electrical and control systems
- Inspection and alignment of mechanical components and equipment
- Commissioning and functional testing
- No-load and load testing
- Support for final acceptance and operational handover
Project Outcomes
- Installation completed on schedule
- Safe, stable, and reliable equipment operation ensured
- All manufacturer’s technical requirements satisfied
- Equipment ready for commercial operation