SUPPLY AND INSTALLATION OF THE YASKAWA HYBRID CAPACITOR SYSTEM AT CMIT
Structural Upgrade- Customer name:
- Cai Mep International Terminal (CMIT)
- Customer address:
- Cái Mép, Bà Rịa – Vũng Tàu
- Industry:
- Port
- Project location:
- Bà Rịa – Vũng Tàu
Project details
SUPPLY AND INSTALLATION OF THE YASKAWA HYBRID CAPACITOR SYSTEM AT CMIT
Client: Cai Mep International Terminal (CMIT)
Project: Yaskawa Hybrid Capacitor System Installation
Location: Cai Mep, Ba Ria–Vung Tau
Work Category: Supply and Installation
Solution: Yaskawa Hybrid Energy Storage System
Bac Au carried out the supply and installation of a Yaskawa hybrid capacitor system to improve energy efficiency and optimise the operational performance of port equipment. The solution incorporates advanced energy-storage technology to help stabilise the power supply, reduce the load on the drive system, and enhance operational reliability.
The project covered the entire implementation process, including equipment supply, installation, technical inspection, testing, commissioning, final acceptance, and operational handover. All work was completed in accordance with the client’s technical requirements and project schedule.
Scope of Work
- Supply of the Yaskawa hybrid capacitor system
- Installation and integration with the existing system
- Technical inspection, testing, and commissioning
- Final acceptance and operational handover
Project Outcomes
- Improved energy efficiency
- Enhanced electrical system stability
- Optimised operational performance of port equipment
- Safe and reliable operation ensured